Scope of the executed works:
- Development of the concept and design of connecting measurement circuits in the existing bays of the MV switchboard.
- Modernization of MV switchboard bays involving connections, installation and commissioning of network parameter analyzers.
- Modernization of the 400 V switchboard with two new motor bays for high-power fans