Prefabrication and assembly of motor bays for Air Liquide Polska SP. z o. o. unit Głogów

22 October 2024

udostępnij

Scope of the executed works:

  • Development of the concept and design of the LV switchboard bays supplying the fan motors of the circulating water cooling tower.
  • Prefabrication and assembly of new LV switchboard bays supplying the fan motors of the circulating water cooling tower.
  • Commissioning of new LV switchboard bays.
  1.  
  2.