Scope of the executed works:
- Development of a concept for lighting and “low-current” power supply.
- Development of a concept for lightning protection.
- Development of a concept for access control for the Ex zone (gas reduction station for powering boilers of 150 [MWe] power units).
- Preparation of complete technical documentation in the field of basic and emergency lighting.
Preparation of complete technical documentation for “low-current” power supply. 400[VAC], auxiliary circuits 230[VAC] and access control in the Ex zone. - Preparation of complete technical documentation for monitoring emergency lightning along with software and launching the visualization system on an industrial PC computer.
- Prefabrication of complete indoor and outdoor LV electrical switchboards.
- Purchase, assembly and delivery of materials to the site.
- Installation, connection and commissioning of the installation in the above-mentioned scopes.